Skip To Main Content

River Grove Elementary

A modern, multi-story building with a mix of brick and metal siding, surrounded by a well-landscaped outdoor area with a paved walkway and lush greenery.
A modern, multi-story building with a colorful facade stands in a well-landscaped courtyard, where a group of people can be seen walking.
river grove cafeteria windows
river grove common area with students
river grove classroom
river grove stem lab entrance
river grove stairs
A modern, wooden-paneled interior with large windows overlooking a forested landscape, featuring a person walking up a set of stairs.
A modern, well-lit hallway with wooden paneling on the walls and ceiling, featuring several people walking in the background.
The image depicts a colorful and vibrant office space with a person in the foreground working at a desk, surrounded by various furnishings and decor elements.
river grove building and courtyard
A modern, multi-story building with large windows and a grassy area in the foreground, where several people are engaged in various activities.
rg playground full of families
river grove front of school with students and adults

The new River Grove Elementary School opened in the fall of 2024.  It was constructed on the same site as the former school building, built in 1968. This site is approximately 9.26 acres in the City of Lake Oswego. Construction began in June 2022 and was completed for the school to open in fall 2024. 

The new River Grove building is approximately 79,800sf and includes single-story and two-story components.

The scope of work included demolition and abatement of the existing 1968 school building, which was approximately 58,000 sf, and an additional 9,600 sf of portable classroom buildings.

Site programming includes:

  • Parking for approximately 70 stalls
  • Pick-up and drop-off area for parents
  • Pickup and drop-off area for approximately six buses
  • Service yard for kitchen deliveries
  • Off-site improvements as determined by the City of Lake Oswego
  • Stormwater treatment and detention on site
  • Elementary-level playing field for soccer and PE activities
  • Hard-surface and soft-surface playground areas with a play structure adjacent to a covered play area
  • Large garden bed area adjacent to an outdoor covered classroom

Project Updates
Meeting Materials/Presentations
FAQs

Project Team


Tony Vandenberg
Executive Director of Project Management

Debbie Hansen
Program Coordinator

River Grove School Upgrades: Transportation Evaluation

Project Timeline


February 28, 2024: Substantial Completion

Fall 2024: New school opened for the school year!