Improve Accessibility
Gabe Acosta, Senior Project Manager
May 2025 Status Summary:
- McEwan sidewalks and stormwater design is complete
- The project will include some vegetation trimming and the potential removal of some trees to permit the placement of sidewalks
- The design currently includes cast-in-place concrete sidewalks with potential for some asphalt paving locations
- The city has prioritized the project, and the school district has proposed an increased contribution
April 2025 Status Summary:
- McEwan sidewalks and stormwater design is complete
- Current construction schedule is contingent on funding partnerships and city input
- The project will include some vegetation trimming and the potential removal of some trees to permit the placement of sidewalks
- The design currently includes cast-in-place concrete sidewalks with potential for some asphalt paving locations
Cell Tower Emergency Access
Gabe Acosta, Senior Project Manager
May 2025 Status Summary:
- Design is nearly completed and will be submitted to the city in the coming weeks
- The project will include some vegetation trimming and the potential removal of one tree to permit the placement of a concrete driveway
- City of Lake Oswego has been consulted regarding the project approach and feasibility
April 2025 Status Summary:
- Design is underway and will include a concrete driveway for maintenance vehicles only
- The project will include some vegetation trimming and the potential removal of one tree to permit the placement of a concrete driveway
- City of Lake Oswego has been consulted regarding the project approach and feasibility