Improve Accessibility

McEwan Sidewalk

Gabe Acosta, Senior Project Manager


May 2025 Status Summary:

  • McEwan sidewalks and stormwater design is complete
  • The project will include some vegetation trimming and the potential removal of some trees to permit the placement of sidewalks
  • The design currently includes cast-in-place concrete sidewalks with potential for some asphalt paving locations
  • The city has prioritized the project, and the school district has proposed an increased contribution 

April 2025 Status Summary:

  • McEwan sidewalks and stormwater design is complete
  • Current construction schedule is contingent on funding partnerships and city input
  • The project will include some vegetation trimming and the potential removal of some trees to permit the placement of sidewalks
  • The design currently includes cast-in-place concrete sidewalks with potential for some asphalt paving locations

Cell Tower Emergency Access

Gabe Acosta, Senior Project Manager


May 2025 Status Summary:

  • Design is nearly completed and will be submitted to the city in the coming weeks
  • The project will include some vegetation trimming and the potential removal of one tree to permit the placement of a concrete driveway
  • City of Lake Oswego has been consulted regarding the project approach and feasibility

April 2025 Status Summary:

  • Design is underway and will include a concrete driveway for maintenance vehicles only
  • The project will include some vegetation trimming and the potential removal of one tree to permit the placement of a concrete driveway
  • City of Lake Oswego has been consulted regarding the project approach and feasibility